SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-F-139
Integration of the transit and transmission system - reverse flow Isaccea
FID
Pipeline including CS
None
Multilateral Financing
Web Link
Promoter
Transgaz
Not part of TEN-E
Public Financing
Operator
Transgaz
Yes
Private Financing
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
2010
Total Pipeline Length (km)
% Exemption in entry direction
–
Last completed Phase :
Permitting
Diameter (range) (mm)
Exemption granted ?
Not relevant
Commissioning
2016
Expected Load Factor
% Exemption in exit direction
–
Diameter (range) (inches)
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
29