ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 30

Modelled Direction
Yes
entry
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
Isaccea (RO) - Orlovka (UA)
147.00
Transit Ukraine
Hub Romania
DESCRIPTION OF THE PROJECT
The project implies the construction of a connection pipeline between the DN 1000 Pipeline (Transit 1 Bulgaria) and the Romanian Transmission System, with the possibility to meter the natural gas volumes transmitted in both
directions. The project is currently under reassessment.
EXPECTED BENEFITS
Security of Supply, Market integration (RO, BG, UKR), Reverse Flows, Diversification of sources, Power-to-gas, Biogas.
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
ENTSOG TYNDP 2013-2013 - Annex A