ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 23

SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
16%
In PCI list?
84%
IGAs
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-F-016
Slovakia - Hungary interconnection
FID
Pipeline including CS
1
Multilateral Financing
Web Link
-
interconnector
Promoter
eustream, a.s.
Not part of TEN-E
Public Financing
Operator
eustream, a.s.
Yes
Private Financing
Considered TPA Regime
Regulated
End of permitting phase
2012 Q1
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
2012 Q2
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
2010 Q1
Total Pipeline Length (km)
+18.00
% Exemption in entry direction
Last completed Phase :
FID
Diameter (range) (mm)
DN 800
Exemption granted ?
No
Commissioning
2015 Q1
Expected Load Factor
+0.80
% Exemption in exit direction
Diameter (range) (inches)
32"
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
23