ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 31

SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
50%
In PCI list ?
50%
IGAs
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Web Link
Considered TPA Regime
Considered Tariff Regime
Regulated
Regulated
Diameter (range) (mm)
Diameter (range) (inches)
2013
# of Pipelines, nodes, CS
Total Pipeline Length (km)
1
Applied for Exemption ?
Exemption granted ?
% Exemption in entry direction
% Exemption in exit direction
Total Compressor Power (MW)
Expected Load Factor
End of permitting phase
Not relevant
No
Commissioning
2010
FID
Construction
Commissioning
Last completed Phase :
None
Reverse flow at Negru Voda
Transgaz
Transgaz
Pipeline including CS
TRA-F-142
FID
Promoter
Operator
Private Financing
Public Financing
Multilateral Financing
Not part of TEN-E
No
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
31