Background Image
Previous Page  41 / 68 Next Page
Basic version Information
Show Menu
Previous Page 41 / 68 Next Page
Page Background www.read-tpi.com

January 2009 Tube Products International

39

Gas products

Water and

Cast iron drainage system used in

student accommodation development

The versatility of the Ensign cast iron drainage system from Saint-Gobain

Pipelines has resulted in its specification for a major new student accommodation

development in Manchester, UK.

The Plymouth Grove development, built

by Browns Construction in the city’s

Longsight area, is home for up to 465

students in en suite rooms, in 10 blocks

of up to 12 storeys each.

Mechanical and electrical consultant

firm Foreman Roberts was keen to

ensure a robust drainage system that

could not easily be damaged.

A further consideration was the ‘pod’

style en suite bathrooms with the

shower at the lowest point, which

ideally needed a drainage system that

could easily link to the outlet pipes from

both the shower and the toilet.

Foreman Roberts specified the Saint-Gobain Pipelines Ensign product – the

only cast iron drainage system accredited to the BS EN 877 standard.

The range includes tail branches long enough to be passed through floor slabs

without the need for connections, and with up to four boss connections to

which both the shower and toilet outlet pipes could be fitted, making them

suitable for the bathroom pods at Plymouth Grove.

The installation, by Liverpool-based The Strong Group Ltd, took place over a

period of nearly a year as the site developed. Ryan Spencer, associate director

at The Strong Group, commented,

“The Ensign range was perfect for this

installation due to its robustness, durability, fire resistance and its flexibility to

cope with the requirements of the bathroom pods, and the long tail branches

with their choice of boss connections negated the need for joints in the floor

slab. This project is an indication of how the sector sees cast iron as a high-

quality, premium product offering performance and cost benefits over the

competition.”

Saint-Gobain Pipelines

– UK

sales.uk.pipelines@saint-gobain.com

www.saint-gobain-pipelines.co.uk

Shanghai Shangshang Stainless

Steel Pipe Co Ltd is a civil joint-stock

enterprise, jointly invested and founded

by Zhejiang Yongshang Stainless Steel

Industrial Co Ltd, along with other

partners.

Themanufacturer specialises in stainless

steel seamless pipes and tubes, and

special pipes for petroleum, natural gas

and other industrial purposes. Founded

in 2001, the company owns factory

buildings covering an area of more than

80,000m

2

, with total floor area as large

as 50,000m

2

.

Shanghai Shangshang Stainless

Steel Pipe Co Ltd

– China

sale@shangshang.com.cn www.shangshang.com.cn

Seamless stainless steel pipes

from Shanghai Shangshang

feeding into a single manifold. Simple

DOL or star-delta starting was out of

the question, as a 20 second start-up

period was necessary to enable the

connecting pipe work to be monitored

for minor leakages during start-up

and to facilitate a rapid and controlled

shut-down if necessary. To enable the

necessary degree of control, SABSCO

selected two Softstart 58-400-0-S soft-

start units, which were used to control

the two high pressure pumps.

The pump system needed to be built as

a portable rig due to the nature of the

work undertaken. The soft-start units

were supplied built into a control panel,

also supplied by Softstart UK Ltd, which

contained additional motor control

equipment. According to Mr Smith,

“I have used products from Softstart UK

on many occasions over the past few

years and knew they could deliver. The

equipment has proved to be reliable and

rugged, which is exactly what we need

in the environments in which we work.

Quality of service from enquiry to after-

sales is very high on our list of priorities,

and we continue to experience this from

Softstart. This new and now proven

technique has given us and our client

clear schedule benefits.”

Softstart UK Ltd

– UK

sales@softstartuk.com www.softstartuk.com

SABSCO Ltd

– UK

www.sabsco.com

Two 30kW high pressure pumps, plus

S

S

control panel

Saint-Gobain’s Ensign drainage

S

S

system features tail branches long

enough to pass through floor slabs

without connections