Simon Storage - Tyne Terminal

Tank 24 Road Loading Upgrade - Installation Scope of Work

P & I Design Ltd

DOCUMENT NO: SI204001_INS

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.06.14

Tel: + 44 (0)1642 617444

PAGE 5 OF 5

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

3.6

Scope of Work – Local Pneumatic Panel

The panel is to be re-piped to accommodate the two stage pneumatic control to the

batching valve shown on drawing SI347012_DWG.

The works comprise, briefly :-

Remove the manual open switch, blanking panel door suitably

Remove the I/P converter.

Install a second Solenoid valve and regulator.

Install a new shuttle valve.

Re-pipe as shown on drawing SI347012_DWG.

Connect cable SOV12A/CP3 to the new Solenoid Valve

3.7

Scope of Work – Batching Valve

The existing batching valve is to be replaced with an identical unit.

The works comprise, briefly :-

Remove tubing from existing valve

The existing valve will be removed from the pipeline and replaced by others.

Replace tubing to new valve

3.8

Free Issue Equipment

The following will be free issued to the installation contractor, all other equipment to

complete the installation shall be provided by the installation contractor.

Turbine meter

Batcher

I.S. isolator XY004

Batching valve complete with actuator and positioner

Pneumatic components for control panel comprising :-

o

1 off 24Vdc solenoid valve (Note : existing 24Vdc solenoid valve to be

recovered and re-used)

o

2 off regulators with gauges

o

1 off shuttle valve