Simon Storage - Tyne Terminal
Tank 24 Road Loading Upgrade - Installation Scope of Work
P & I Design Ltd
DOCUMENT NO: SI204001_INS
2 Reed Street, Thornaby, UK, TS17 7AF
Tel: + 44 (0)1642 617444
Fax: + 44 (0)1642 616447
www.pidesign.co.ukAppendix I
Drawings
SI347001_DWG Rev B – Cable Overview (Existing System)
SI347001_DWG Rev C – Cable Overview (Revised System)
SI347005_DWG Rev A – CP2 Panel Layout (Existing Layout)
SI347005_DWG Rev B – CP2 Panel Layout (Revised Layout)
SI347007_DWG Rev C – CP2 Panel Logic (Existing System)
SI347007_DWG Rev D – CP2 Panel Logic (Revised System)
SI347012_DWG Rev A – Loading System Connection Details (Existing System)
SI347012_DWG Rev B – Loading System Connection Details (Revised System)
SI347025_DWG Rev C – Control Unit CP3 Connection Details (Existing System)
SI347025_DWG Rev D – Control Unit CP3 Connection Details (Revised) System