www.pidesign.co.uk4.1 Hazard and Risk Assessment (BS EN61511-1:2004 Section 8.1)
This FSA will consider if the method of Risk Assessment conducted for this project complies
to the required objectives of the standard.
Extract from BS EN 61511-1:2004 – Section 8.1 Objectives
The hazards and hazardous events of the process and associated equipment were
determined in a LOPA review (Reference LOP-D426-06 Overfill of Storage Tanks at
Bramhall dated 9th February 2007.
The sequence of events leading to the hazardous event were also determined in the
LOPA review.
The process risks were determined.
The LOPA considered that additional risk reduction was required by the inclusion of
an additional Safety Instrumented Protection Layer.
From the LOPA, risk reduction is to be achieved by the inclusion of a SIL 1 rated
Layer of Protection comprising of a common gasoline supply line valve activated via a
logic solver from level switches on all tanks.
The LOPA referenced above was carried out in 2007. During the FSA it was noted that an
updated LOPA has been produced. This assessment was not available and as such could not
be reviewed. The new assessment will be made available.
See e-mail trail justifying SIL 1 (Appendix 1).