Table of Contents Table of Contents
Previous Page  45 / 65 Next Page
Information
Show Menu
Previous Page 45 / 65 Next Page
Page Background

AOAC Research Institute Policies and Procedures

© 2009 - AOAC Research Institute

8

4.3.2 Contracts and Invoicing

4.3.2.1 Independent Testing Site Contract:

Upon acceptance of the testing proposal by the Method Developer,

the AOAC Research Institute and the independent testing site shall

enter into a contract agreement describing the responsibilities of the

independent testing site. See Appendix 9 for an Independent

Laboratory Contract.

Attached to or included in this contract shall be:

1)

An Independent Validation Study Protocol describing the

tasks to be accomplished. This will include a description of

the test method to be evaluated, number of fortification

levels, replicate analyses, total number of tests, multiple day

testing, etc.

2)

Time line for completing the task

3)

Independent testing site's fee and responsibility for expenses.

NOTE: The AOAC-RI will not enter into any agreement with a

contract testing site until all application fees have been paid in full.

4.3.2.2 Agreement for Independent Testing:

The Method Developer shall sign an agreement with the AOAC

Research Institute for the independent testing stating that the

Method Developer:

1)

Accepts the selected independent testing site

2)

Accepts the independent testing site cost estimates

3)

Authorizes the AOAC Research Institute to sign an

agreement with the independent testing site

4)

Agrees to pay the testing site costs unless egregious errors

can be proven

See Appendix 10 for the Method Developer Agreement for

Independent Testing.

4.3.2.3 Invoices:

The AOAC-RI will issue an invoice to the Method Developer in an

amount equal to the cost estimate of the project. The invoice will be

issued on the day the Agreement for Independent Testing is signed.