AOAC Research Institute Policies and Procedures
© 2009 - AOAC Research Institute
6
United States of America
Fax: *01-301 924-6917
4.2.1
Performance Tested Methods
SM
Application Review:
The PTM Application package will be reviewed for completeness by AOAC-
RI staff. An acknowledgement letter, checklist review, and an invoice will be
sent to the Method Developer within two business days of receiving an
application.
4.2.2 Check List:
The Check List contained in the PTM Application package is intended for
use by the Method Developer and the AOAC-RI staff to determine if the
basic submission requirements have been satisfied. (Appendix 7)
4.2.3 Certification of QA Program and QC Practices:
Method Developers must submit a description of the quality assurance
program and quality control practices used in the manufacturing, production,
storage, and delivery of the test method components. The description must
include the sampling system followed, with particular reference to the tests
used to verify that test method component production meets established
production standards. To protect proprietary information, the certification
may be submitted in the form of a signed letter with no more than four to six
page description of the QA/QC program.
Note
: test method components
used in the validation studies must be final GMP manufactured components.
Research and development test method components cannot be used.
The Method Developer shall use a performance monitoring system that will
provide production management with the information necessary to assure
that the test method components continue to meet the requirements of the
specifications to which the test method was originally evaluated and granted
PTM status. The system shall include the methods, procedures, controls,
records, and maintenance of the system to provide continuing assurance of
compliance with the performance specifications advertised. The extent of
this system will depend on the characteristics of the test method and on the
performance specifications.
4.2.4 Project Manager:
A Project Manager is assigned by the AOAC-RI Program Manager when a
PTM application is submitted. Typically, the Technical Consultant who
provided the Consulting Service is assigned as the Project Manager for the
PTM
review. A Method Developer may request a different Project Manager
at any time.