Southern Corridor GRIP 2017–2026

0

50,000

100,000

250,000

300,000

350,000

400,000

450,000

150,000

200,000

500,000

GWh/y

2013 2013 2014 2015 2016 2017

2019

2021

2018

2020

2022 2023 2024 2025 2026

Slovakia

Cyprus

Romania

Italy

Hungary

Croatia

Bulgaria

Austria

Figure 4.3:

National production forecast with and without the production of Cyprus

0

50,000

100,000

250,000

300,000

150,000

200,000

350,000

GWh/y

2013 2013 2014 2015 2016 2017

2019

2021

2018

2020

2022 2023 2024 2025 2026

Slovakia

Romania

Italy

Hungary

Croatia

Bulgaria

Austria

Image courtesy of DESFA

It has however to be noted that the estimation of the effective, and not only arithmetic,

share of national production on the Region’s demand depends on the final

destination of the Cypriot gas.

In fact, this gas will need to be exported but it is not yet known in what form (liquid

or gaseous) neither to which destination. Moreover, the quantities discovered so far

do not seem sufficient to make feasible the initial plan of installing a liquefaction

plant in Cyprus, however exploration still goes on and there are more promising

areas to be explored. Among the export schemes proposed are a pipeline to Turkey,

(a low probability option), a pipeline to Egypt, either to cover the growing needs of

this country or to use its liquefaction installations (an option with reduced appeal

since the discovery the Zhor gas field in Egypt) and a pipeline to Crete and on to

continental Greece, connected to the Poseidon offshore pipeline connecting Greece

with Italy (an option technically challenging). In order to enhance the feasibility of

this last option, Cyprus could team with other countries of the eastern Mediterranean,

like Israel and possibly Lebanon, so that a critical mass is reached that will increase

the attractiveness of such a gas export project. The number of potential partners and

the tensions inherent to this Region make, at this stage, any prediction on the

successful option uncertain. In the present GRIP the non-FID project of a pipeline

linking the eastern Mediterranean gas fields to Greece and further to Italy, proposed

by 3

rd

parties, has been included.