Southern Corridor GRIP 2017–2026 |
77
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
GWh/d
IP Ungheni (RO > MD)
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
1,0
0,8
0,6
0,4
0,2
1,4
1,2
Figure 5.61:
Ungheni: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
0
1,0
0,8
0,6
0,4
0,2
1,4
1,2
IP Ungheni (RO > MD)
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
Figure 5.62:
Ungheni: Flows and booked capacity
vs. technical capacity (daily)
Image courtesy of Snam Rete Gas
Ungheni (Transgaz > Vestmoldtransgaz)