Southern Corridor GRIP 2017–2026
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
GWh/d
IP Revythoussa (LNG > GR)
0
140
120
100
60
40
20
80
160
Figure 5.69:
Revythoussa: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
0
140
120
100
60
40
20
80
160
GWh/d
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
IP Revythoussa (LNG > GR)
Figure 5.70:
Revythoussa: Flows and booked capacity
vs. technical capacity (daily)
Revythoussa (DESFA > DESFA)