THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

Projects and Markets

Blackford Dolphin mobile offshore drilling unit renewal survey

Client: Dolphin Drilling Ltd

Period: Quarter 4 2013 to Quarter 2 2014

During the pre-arrival phase Harland and Wolff invested in site

facilities in preparation for the rig arrival, creating an additional

large pipe fabrication workshop and a mechanical outfitting

shop. A purpose-built two-storey project office, large enough to

accommodate 140 engineers and management and local to the

dry-dock, was also erected.

The main work scope for the rig was a special periodic survey

(SPS) that was required prior to commencing its next contract

in the North Sea area. The survey included replacing over

3,000 metres of pipe, of which 700 metres was in the ballast

tanks, and fabricating/installing over 300 tonnes of structural

steel throughout the rig. It also involved fabricating and

installing a new deck in one of the columns to support a new

rig air compressor and dryer, complete with the electrical,

mechanical, piping and HVAC (heating, ventilation and air

conditioning) installation and integration with the rig system.

The project expended circa 1.4 million man-hours with upward

of 1,000 personnel on site at the peak working 24/7 shift

pattern, including over the Christmas holiday period.

Edvard Grieg and Martin Linge jacket clusters and

buoyancy tanks

Client: Kvaerner Verdal AS

Period: Quarter 3 2012 to Quarter 3 2013

Kvaerner Verdal AS awarded the contracts to fabricate pile

sleeve clusters and flotation tanks for Lundin’s Edvard Grieg

jacket and Total’s Martin Linge jacket to Harland and Wolff

Heavy Industries Limited.

Harland and Wolff’s scope of work comprised the fabrication

and delivery of four pile sleeve clusters for each jacket. The

clusters each weigh approximately between 400 and 500

tonnes and are vital elements of the overall jackets. Harland

and Wolff also supplied flotation tanks for both jackets.

>