![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0074.jpg)
4 East Rail Loading
Dye Marker Microload Operating Instructions
P & I Design Ltd
DOCUMENT NO: 16062RPT004
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: B DATE: 19.01.2017
Tel: + 44 (0)1642 617444
PAGE 4 OF 11
Fax: + 44 (0)1642 616447
www.pidesign.co.uk4
HOME SCREEN
This example of the Microload is programmed to load marker dye to either Loading Point 1
on the North siding or Loading Point 7 on the South siding. The screen shown is the home
screen and allows the Operator to commence loading operations. This screen allows the
Operator to follow a series of prompts to allow the completion of the load. The first prompt
requests the operation of the ‘Set’ key.