![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0079.jpg)
4 East Rail Loading
Dye Marker Microload Operating Instructions
P & I Design Ltd
DOCUMENT NO: 16062RPT004
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: B DATE: 19.01.2017
Tel: + 44 (0)1642 617444
PAGE 9 OF 11
Fax: + 44 (0)1642 616447
www.pidesign.co.uk9.
BATCH RUNNING
Once the valve has opened and the dye marker has begun to flow the screen will look like
the above. The top line displays the amount of product measured through the meter while the
second row displays the amount remaining. The bottom line of text displays the flow rate in
litres per minute on the left of the screen, while the right displays the batch size.