Table of Contents Table of Contents
Previous Page  97 / 118 Next Page
Information
Show Menu
Previous Page 97 / 118 Next Page
Page Background

4 East Rail Loading

Dye Marker Microload Operating Instructions

P & I Design Ltd

DOCUMENT NO: 16062RPT004

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 19.01.2017

Tel: + 44 (0)1642 617444

PAGE 9 OF 11

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

9.

BATCH RUNNING

Once the valve has opened and the dye marker has begun to flow the screen will look like

the above. The top line displays the amount of product measured through the meter while the

second row displays the amount remaining. The bottom line of text displays the flow rate in

litres per minute on the left of the screen, while the right displays the batch size.