Table of Contents Table of Contents
Previous Page  96 / 118 Next Page
Information
Show Menu
Previous Page 96 / 118 Next Page
Page Background

4 East Rail Loading

Dye Marker Microload Operating Instructions

P & I Design Ltd

DOCUMENT NO: 16062RPT004

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 19.01.2017

Tel: + 44 (0)1642 617444

PAGE 8 OF 11

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

8.

VALVE DELAY

Once the batch start has been operated the batcher will send the signal to start the pump

followed by a 5 second delay before the opening of the valve. The above photograph is

showing this count down in action.