Compressor stations 2 and 3 at the Croatian gas tranmission system
General Information
Promoter
Plinacro Ltd
Operator
Plinacro Ltd
Host Country
Croatia
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Plinacro
100%
TRA-N-1057
Project
Pipeline including CS
Non-FID
Update Date
14/07/2016
Non-Advanced
Description
Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural
gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will
significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated
in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational
increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the
application of new legal regulation.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod)
TRA-N-070 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo)
TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Croatia LNG
Plinacro Ltd
2020
LNG_Tk_HR
HR
43.3 GWh/d
Dravaszerdahely
Plinacro Ltd
2020
HR
HU
43.3 GWh/d
Plinacro Ltd
2020
HU
HR
62.5 GWh/d