LNG Evacuation Pipeline Kozarac-Slobodnica
General Information
Promoter
Plinacro Ltd
Operator
Plinacro Ltd
Host Country
Croatia
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Plinacro
100%
TRA-N-1058
Project
Pipeline including CS
Non-FID
Update Date
13/07/2016
Non-Advanced
Description
Gas pipeline Kozarac - Slobodnica jointly with gas pipeline sytem Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Omišalj-Zlobin makes LNG
Main Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline system is
a continuation of the existing Hungary – Croatia interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica) will be
connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the
Croatian gas system.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)
TRA-N-1057 Compressor stations 2 and 3 at the Croatian gas tranmission system
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Croatia LNG
Plinacro Ltd
2023
LNG_Tk_HR
HR
109.9 GWh/d
Dravaszerdahely
Plinacro Ltd
2023
HR
HU
58.8 GWh/d
Plinacro Ltd
2023
HU
HR
56.6 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 302 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
79