LNG Evacuation Pipeline Kozarac-Slobodnica

General Information

Promoter

Plinacro Ltd

Operator

Plinacro Ltd

Host Country

Croatia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinacro

100%

TRA-N-1058

Project

Pipeline including CS

Non-FID

Update Date

13/07/2016

Non-Advanced

Description

Gas pipeline Kozarac - Slobodnica jointly with gas pipeline sytem Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Omišalj-Zlobin makes LNG

Main Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline system is

a continuation of the existing Hungary – Croatia interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica) will be

connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the

Croatian gas system.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac

TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)

TRA-N-1057 Compressor stations 2 and 3 at the Croatian gas tranmission system

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

Plinacro Ltd

2023

LNG_Tk_HR

HR

109.9 GWh/d

Dravaszerdahely

Plinacro Ltd

2023

HR

HU

58.8 GWh/d

Plinacro Ltd

2023

HU

HR

56.6 GWh/d