Expected Gas Sourcing

Caspian Region, LNG (HR,QA), it can be gas from Croatian transport system, Croatian UGS and all import routes

Benefits

Main Driver

Market Demand

Main Driver Explanation

For the western part of Bosnia and Herzegovina

Benefit Description

The aim of the project is to assess the feasibility of providing gas supply to the Una-Sana Canton in BiH from the Croatian gas transmission system. It will

be from the Lička Jesenica gas transmission node in Croatia via Lika to the HR/BiH border and from there to Bosanska Krupa with brances to Bihać and

velika Kladuša in Una-Sana Canton. The extension of the gas transmission in Croatia to the border with BiH will allow additional gasification in the part of

Croatia along the pipeline route.

Barriers

Barrier Type

Description

Market

Lack of market support

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Lička Jesenica-Rakovica

500

20

Rakovica-Bihać

500

10

Total

30

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

12/2012

09/2026

Supply Contracts

FID

12/2024

Construction

04/2025

11/2026

Commissioning

2026

2026

NDP and PCI Information

Part of NDP

Yes (2017-2026)

NDP Number

1.32 and 1.33

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

70.00%

Exemption in exit direction

30.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 293 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

83