Expected Gas Sourcing
Caspian Region, LNG (HR,QA), it can be gas from Croatian transport system, Croatian UGS and all import routes
Benefits
Main Driver
Market Demand
Main Driver Explanation
For the western part of Bosnia and Herzegovina
Benefit Description
The aim of the project is to assess the feasibility of providing gas supply to the Una-Sana Canton in BiH from the Croatian gas transmission system. It will
be from the Lička Jesenica gas transmission node in Croatia via Lika to the HR/BiH border and from there to Bosanska Krupa with brances to Bihać and
velika Kladuša in Una-Sana Canton. The extension of the gas transmission in Croatia to the border with BiH will allow additional gasification in the part of
Croatia along the pipeline route.
Barriers
Barrier Type
Description
Market
Lack of market support
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Lička Jesenica-Rakovica
500
20
Rakovica-Bihać
500
10
Total
30
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
12/2012
09/2026
Supply Contracts
FID
12/2024
Construction
04/2025
11/2026
Commissioning
2026
2026
NDP and PCI Information
Part of NDP
Yes (2017-2026)
NDP Number
1.32 and 1.33
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
70.00%
Exemption in exit direction
30.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 293 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
83