Croatia LNG
Comment: Minimum on-shore LNG terminal size based on the most appropriate capacity
booked through the Open Season
1×150.000m3storagetank
Utilization of jetty used also for the FSRU terminal
COD - 2021-2023
(depending on duration of FSRU charter contract)
Capacity Increments Variant(s) For Information Only
Variant : 4. - Onshore LNG terminal
4th phase - LNG onshore terminal with annual send-out capacity of 8.75 bcm/y
Point
Operator
Year
From Gas System To Gas System Capacity
Croatia LNG
LNG Hrvatska d.o.o.
2024
LNG_Tk_HR
HR
100.0 GWh/d
Comment: If market demands, expand (with minimum investment in re-gasificators) the LNG
terminal send-out
COD - 2024+
Capacity Increments Variant(s) For Information Only
Variant : 3. - Onshore LNG terminal
3rd phase - LNG onshore terminal with annual send-out capacity of 5 bcm/y
Point
Operator
Year
From Gas System To Gas System Capacity
Croatia LNG
LNG Hrvatska d.o.o.
2023
LNG_Tk_HR
HR
40.0 GWh/d
Comment: In case that the limited volume risk condition is reached, expansion
Introduction of the second tank to allow peak management
COD - 2021/2023
(depending on duration of FSRU charter contract)
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 279 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
88