Page Background

Croatia LNG

Comment: Minimum on-shore LNG terminal size based on the most appropriate capacity

booked through the Open Season

1×150.000m3storagetank

Utilization of jetty used also for the FSRU terminal

COD - 2021-2023

(depending on duration of FSRU charter contract)

Capacity Increments Variant(s) For Information Only

Variant : 4. - Onshore LNG terminal

4th phase - LNG onshore terminal with annual send-out capacity of 8.75 bcm/y

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

LNG Hrvatska d.o.o.

2024

LNG_Tk_HR

HR

100.0 GWh/d

Comment: If market demands, expand (with minimum investment in re-gasificators) the LNG

terminal send-out

COD - 2024+

Capacity Increments Variant(s) For Information Only

Variant : 3. - Onshore LNG terminal

3rd phase - LNG onshore terminal with annual send-out capacity of 5 bcm/y

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

LNG Hrvatska d.o.o.

2023

LNG_Tk_HR

HR

40.0 GWh/d

Comment: In case that the limited volume risk condition is reached, expansion

Introduction of the second tank to allow peak management

COD - 2021/2023

(depending on duration of FSRU charter contract)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 279 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

88