Table of Contents Table of Contents
Previous Page  196-197 / 610 Next Page
Information
Show Menu
Previous Page 196-197 / 610 Next Page
Page Background

Expected Gas Sourcing

Caspian Region, Russia, LNG (), Other Central Asian, Middle Eastern and East-Mediterranean sources

Benefits

Main Driver

Market Demand

Main Driver Explanation

Benefit Description

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

0

Delay Explanation

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations - Alternative Variant

206.40 GWh/d

case where TAP will be, from the beginning, connected to

TANAP at the GR/TR border, and IGB will be supplied by the

DESFA network therefore the C/S will supply gas to the

DESFA system and the ones of neighbouring operators

through IGB.

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Kipi

0

0

18

Total

0

18

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 233 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

99