Eastring - Slovakia
TRA-N-628
Project
Pipeline including CS
Non-FID
Update Date
25/05/2016
Non-Advanced
Description
Eastring-SK is subproject located in Slovakia/Ukraine and is essential part of the Eastring project, which connects IP Veľké Kapušany at the SK-UA
border, with a new entry IP at an external border of the EU on the territory of Bulgaria in the following routing options: − from SK to RO − via UA,
(exist. pipeline) − via HU, (new pipeline). − from RO to TR − Option A – new pipeline passing production & storage area and continuing to IP Isaccea
and to BG/TR border by utilizing existing RO-BG transit assets − Option B – new pipeline, passing 2 production & storage areas and continuing to an
external border of the EU on the territory of Bulgaria. The project would (i) secure supplies in case of RU disruption and therefore it will increase gas
SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western & Southern Europe and (iii) mean
step towards EU single gas market.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Variant : Eastring - SK-2
High capacity scenario, starting at Veľké Kapušany IP and passing through SK using new
pipeline to new IP at SK-HU border
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring Cross-Border HU/EAR <> SK/EAR
Eastring B.V.
2021
HU/EAR
SK/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Eastring B.V.
2021
SK/EAR
HU/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Eastring B.V.
2025
HU/EAR
SK/EAR
570.0 GWh/d
Eastring B.V.
2025
SK/EAR
HU/EAR
570.0 GWh/d
Eastring SK/EAR <-> Veľké Kapušany
Eastring B.V.
2021
SK
SK/EAR
570.0 GWh/d
Comment: Connection of Eastring - SK to existing SK transmission system at Veľké Kapušany IP
(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Eastring B.V.
2021
SK/EAR
SK
570.0 GWh/d
Comment: Connection of Eastring - SK to existing SK transmission system at Veľké Kapušany IP
(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Eastring B.V.
2025
SK
SK/EAR
570.0 GWh/d