Pipelines and Compressor Stations
Eastring - SK-2
High capacity scenario, starting at Veľké Kapušany IP and
passing through SK using new pipeline to new IP at SK-HU
border
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eastring-SK-2
Data refers to the first stage - capacity 570 GWh/d for new
route via SK,HU,RO,BG, in case of increase of capacity up to
1140 GWh/d in 2023, compressor power at level of 93 MW will
be needed
1,400
19
52
Total
19
52
Pipelines and Compressor Stations - Alternative Variant
Eastring – SK-1
High capacity scenario, starting at Veľké Kapušany IP and
passing through SK using new pipeline to new IP at SK-HU
border with following continuance to RO and BG existing
system
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eastring-SK-1
Data refers to the first stage - capacity 570 GWh/d for new
route via SK, HU and partly RO and existing route via RO & BG,
in case of increase of capacity up to 1140 GWh/d in 2023,
compressor power at level of 90 MW will be needed
1,400
19
42
Total
19
42
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
05/2016
04/2017
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2021
2025
NDP and PCI Information
Part of NDP
Yes (National Development Plan 2016-
2025)
NDP Number
10.1.2. Eastring
Currently PCI
Yes (6.25.1)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Not Applicable
Considered Tariff Regime
Not Applicable
Applied for Exemption
Not Relevant
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 542 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
274