Benefits
Main Driver
Market Demand
Main Driver Explanation
Also essential contribution to Security of supply.
Benefit Description
PCI Details
PCI Benefits
Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Upgrade of Rogatec interconnection
The length is 3.8 km.
800
4
Total
4
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
01/2018
11/2019
Market Test
Permitting
12/2015
10/2019
Supply Contracts
FID
01/2018
Construction
01/2019
12/2020
Commissioning
2020
2020
NDP and PCI Information
Part of NDP
Yes (TYNDP for the period 2016-2025)
NDP Number
C12
Currently PCI
Yes (6.26.6)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 533 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
278