Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)
General Information
Promoter
Plinovodi d.o.o.
Operator
Plinovodi d.o.o.
Host Country
Slovenia
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Plinovodi
100%
TRA-N-390
Project
Pipeline including CS
Non-FID
Update Date
22/05/2016
Advanced
Description
Adjustment to operating parameters of the transmission system of the Croatian TSO, increasing the transmission capacity and enabling bidirectional
operation. The project is a part of the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-389 Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak)
TRA-N-094 CS Kidričevo, 2nd phase of upgrade
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Rogatec
Plinovodi d.o.o.
2020
HR
SI
165.0 GWh/d
Plinovodi d.o.o.
2020
SI
HR
165.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 532 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
277