Eastring SK/EAR <-> Veľké Kapušany

Eastring B.V.

2025

SK/EAR

SK

570.0 GWh/d

Capacity Increments Variant(s) For Information Only

Variant : Eastring – SK-1

High capacity scenario, starting at Veľké Kapušany IP and passing through SK using new

pipeline to new IP at SK-HU border with following continuance to RO and BG existing

system

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring Cross-Border HU/EAR <> SK/EAR

Eastring B.V.

2021

HU/EAR

SK/EAR

570.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of

1140 GWh/d.

Eastring B.V.

2021

SK/EAR

HU/EAR

570.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of

1140 GWh/d.

Eastring B.V.

2025

HU/EAR

SK/EAR

570.0 GWh/d

Eastring B.V.

2025

SK/EAR

HU/EAR

570.0 GWh/d

Eastring SK/EAR <-> Veľké Kapušany

Eastring B.V.

2021

SK

SK/EAR

570.0 GWh/d

Comment: Connection of Eastring - SK to existing SK transmission system at Veľké Kapušany IP

(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Eastring B.V.

2021

SK/EAR

SK

570.0 GWh/d

Comment: Connection of Eastring - SK to existing SK transmission system at Veľké Kapušany IP

(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Eastring B.V.

2025

SK

SK/EAR

570.0 GWh/d

Eastring B.V.

2025

SK/EAR

SK

570.0 GWh/d

Capacity Increments Variant(s) For Information Only

Variant : Eastring – SK-3/4

Low capacity scenario, starting at Veľké Kapušany IP at SK-UA border, passing through UA

to new IP at UA-RO border

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring Cross-Border RO/EAR <> UA/EAR

Eastring B.V.

2021

RO/EAR

UA/EAR

570.0 GWh/d

Comment: New interconnection point at UA/RO border, New capacity increment from 4Q 2025

to the level of 1140 GWh/d.

Eastring B.V.

2021

UA/EAR

RO/EAR

342.0 GWh/d

Comment: New interconnection point at UA/RO border, New capacity increment from 4Q 2025

to the level of 712 GWh/d. Exit means direction UA->RO.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 540 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

272