80 |

Gas Regional Investment Plan of the South Region 2017

The following table includes the technical information of this project:

This capacity enhances flexibility of both Spanish and Portuguese networks and

consequently integrates the Portuguese market at Iberian Peninsula level. The 3

rd

IP between Spain and Portugal allows a better integration of Iberian and European

markets and therefore improving competition in these markets. It also contributes to

diversification of European gas supplies, promoting the market integration, security

of supply and competition.

3

RD

INTERCONNECTION BETWEEN SPAIN AND PORTUGAL: INFRASTRUCTURES 

*

Type

TYNDP

Code

Name

Status

Commis-

sioning Year

Section

Length

(km)

Diameter

(mm)

Compressor

Power (MW)

Pipeline

including CS

TRA-N-168

Interconnection

ES-PT (3

rd

IP) –

1

st

phase

Less-Advanced

Non-FID

2021

CS Zamora

4

Pipeline

including CS

TRA-N-168

Interconnection

ES-PT (3

rd

IP) –

1

st

phase

Less-Advanced

Non-FID

2021

Zamora –

Portuguese

Border

86

700

Pipeline

including CS

TRA-N-729

Interconnection

ES-PT (3

rd

IP) –

2

nd

phase

Less-Advanced

Non-FID

2025

Guitiriz – Lugo

28

740

Pipeline

including CS

TRA-N-729

Interconnection

ES-PT (3

rd

IP) -

2

nd

phase

Less-Ad-

vanced

Non-FID

2025

Villafranca del

Bierzo –

Castropodame

30

740

Pipeline

including CS

TRA-N-729

Interconnection

ES-PT (3

rd

IP) –

2

nd

phase

Less-Advanced

Non-FID

2025

Castropodame

– Zamora

170

600

Pipeline

including CS

TRA-N-729

Interconnection

ES-PT (3

rd

IP) –

2

nd

phase

Less-Advanced

Non-FID

2025

Lugo –

Villafranca

del Bierzo

90

740

Pipeline

including CS

TRA-N-729

Interconnection

ES-PT (3

rd

IP) –

2

nd

phase

Less-Advanced

Non-FID

2025

Zamora –

La Barbolla –

Adradas

307

800

Pipeline

including CS

TRA-N-283

3rd IP between

Portugal and

Spain (pipeline

Celorico-Spanish

border)

Advanced

Non-FID

2021

Celorico-

Spanish

border

162

700

Pipeline

including CS

TRA-N-284

3

rd

IP between

Portugal and

Spain (Compres-

sor Station)

Less-Advanced

Non-FID

2025

Cantanhede

Compressor

Station

12

Pipeline

including CS

TRA-N-285

3

rd

IP between

Portugal and

Spain (pipeline

Cantanhede –

Mangualde)

Less-Ad-

vanced Non-

FID

2025

Cantanhede –

Mangualde

67

500

* The infrastructures considered in each step of this project are:

Spain:

1st step: Zamora–Portuguese border (TRA-N-168)

2nd step: Guitiriz–Zamora–Adradras pipelines (TRA-N-729)

Portugal:

1st step: Celorico–Spanish border (TRA-N-283)

2nd step: Cantanhede CS (TRA-N-284)

3rd step: Cantanhede-Mangualde pipeline (TRA-N-285)

Table 6.7:

3

rd

Interconnection between Spain and Portugal: infrastructures (Source: TYNDP 2017)