Gas Regional Investment Plan of the South Region 2017 |
81
6.2.3.1.2 Between Spain and France
Following the Madrid Declaration in March 2015, a High Level Group (HLG) for
Interconnections in Western Europe was established in order to follow its implemen-
tation. As part of the work done in this HLG, a Joint Technical Study between Enagás,
GRTgaz and TIGF related to MidCat was developed during summer 2015.
Two different approaches were used in this technical study:
\\
The minimum infrastructure required for connecting both countries: STEP
project.
\\
The infrastructures required to achieve the target firm capacity (230GWh/d
from Spain to France and 180GWh/d from France to Spain): MidCat project.
STEP (TRA-N-161 + TRA-N-252)
In Spain, this project (TRA-N-161) consists of two pipelines (Hostalrich – Figueras
and Figueras-French border), and a new compressor station in Martorell (36MW).
In France (TIGF zone), the project (TRA-N-252) consists in a pipeline between
Barbaira and the Spanish border. The total length of the project is 107km in Spain
and 120km in France. The commissioning date of this project is 2021 in Spain and
2022 in France (TIGF).
This project does not create firm annual capacities in both sides of the interconnec-
tion. Consequently, the capacity created by this project is not considered in the
TYNDP 2017, as ENTSOG NeMo tool only considers firm capacities on an annual
basis. Nevertheless, according to a probabilistic study developed by Enagás, this
project creates in the Spanish side firm capacity: 120GWh/d from Spain to France,
and 110GWh/d from France to Spain. Such probabilistic analysis wasn’t performed
on the French side as the behavior of the French market may change after the merg-
er of zones in 2018.
According to TYNDP 2017 criteria the project was defined as “Advanced non-FID”,
as it received a CEF grant for FEED studies in the second CEF-E call of 2015
5)
.
5) Spain:
https://ec.europa.eu/inea/sites/inea/files/fiche_5.5-0054-esfr-s-m-15_final.pdfFrance:
https://ec.europa.eu/inea/sites/inea/files/fiche_5.5-0048-fr-s-m-15_final.pdfSTEP PROJECT: INFRASTRUCTURES
Type
TYNDP Code Name
Status
Commission-
ing Year
Section
Length
(km)
Diameter
(mm)
Compressor
Power (MW)
Pipeline including
CS
TRA-N-161
South Transit East
Pyrenees (STEP) –
Enagás
Advanced
Non-FID
2021
CS Martorell
36
Pipeline including
CS
TRA-N-161
South Transit East
Pyrenees (STEP) –
Enagás
Advanced
Non-FID
2021
Hostalrich –
Figueras
79
900
Pipeline including
CS
TRA-N-161
South Transit East
Pyrenees (STEP) –
Enagás
Advanced
Non-FID
2021
Pipeline
Figueras –
French Border
28
900
Pipeline including
CS
TRA-N-252
South Transit East
Pyrenees (STEP) –
TIGF
Advanced
Non-FID
2022
Pipeline Spanish
Border-
Barbaira
120
900
Table 6.8:
STEP project: infrastructures (Source: TYNDP 2017)