Gas Regional Investment Plan of the South Region 2017 |

81

6.2.3.1.2 Between Spain and France

Following the Madrid Declaration in March 2015, a High Level Group (HLG) for

Interconnections in Western Europe was established in order to follow its implemen-

tation. As part of the work done in this HLG, a Joint Technical Study between Enagás,

GRTgaz and TIGF related to MidCat was developed during summer 2015.

Two different approaches were used in this technical study:

\\

The minimum infrastructure required for connecting both countries: STEP

project.

\\

The infrastructures required to achieve the target firm capacity (230GWh/d

from Spain to France and 180GWh/d from France to Spain): MidCat project.

STEP (TRA-N-161 + TRA-N-252)

In Spain, this project (TRA-N-161) consists of two pipelines (Hostalrich – Figueras

and Figueras-French border), and a new compressor station in Martorell (36MW).

In France (TIGF zone), the project (TRA-N-252) consists in a pipeline between

Barbaira and the Spanish border. The total length of the project is 107km in Spain

and 120km in France. The commissioning date of this project is 2021 in Spain and

2022 in France (TIGF).

This project does not create firm annual capacities in both sides of the interconnec-

tion. Consequently, the capacity created by this project is not considered in the

TYNDP 2017, as ENTSOG NeMo tool only considers firm capacities on an annual

basis. Nevertheless, according to a probabilistic study developed by Enagás, this

project creates in the Spanish side firm capacity: 120GWh/d from Spain to France,

and 110GWh/d from France to Spain. Such probabilistic analysis wasn’t performed

on the French side as the behavior of the French market may change after the merg-

er of zones in 2018.

According to TYNDP 2017 criteria the project was defined as “Advanced non-FID”,

as it received a CEF grant for FEED studies in the second CEF-E call of 2015 

 5)

.

 5) Spain:

https://ec.europa.eu/inea/sites/inea/files/fiche_5.5-0054-esfr-s-m-15_final.pdf

France:

https://ec.europa.eu/inea/sites/inea/files/fiche_5.5-0048-fr-s-m-15_final.pdf

STEP PROJECT: INFRASTRUCTURES

Type

TYNDP Code Name

Status

Commission-

ing Year

Section

Length

(km)

Diameter

(mm)

Compressor

Power (MW)

Pipeline including

CS

TRA-N-161

South Transit East

Pyrenees (STEP) –

Enagás

Advanced

Non-FID

2021

CS Martorell

36

Pipeline including

CS

TRA-N-161

South Transit East

Pyrenees (STEP) –

Enagás

Advanced

Non-FID

2021

Hostalrich –

Figueras

79

900

Pipeline including

CS

TRA-N-161

South Transit East

Pyrenees (STEP) –

Enagás

Advanced

Non-FID

2021

Pipeline

Figueras –

French Border

28

900

Pipeline including

CS

TRA-N-252

South Transit East

Pyrenees (STEP) –

TIGF

Advanced

Non-FID

2022

Pipeline Spanish

Border-

Barbaira

120

900

Table 6.8:

STEP project: infrastructures (Source: TYNDP 2017)