Gas Regional Investment Plan of the South Region 2017 |

83

6.2.3.2 Interconnection capacities with other EU countries

\\

The creation of a reverse flow from France to Germany at Obergailbach/

Medelsheim (TRA-N-047).

Beyond commercial backhaul capacity already existing from France to Germany is

considering physical

reverse flow from France to Germany

. The PCI creating a

reverse flow from France to Germany would improve access to LNG for the German

market and contribute to respond the need for additional supplies in western Ger-

many as a replacement for L-gas. The creation of this reverse flow (100GWh/d) will

result in reinforcing the network on the North East pipeline. It would also require so-

lutions to harmonise odorisation practises in France and Germany, since gas is

odourised upon entry on the transmission system in France and Spain, whereas it is

done upon entry on the distribution system in Germany. GRTgaz is currently con-

ducting feasibility studies on two types of solutions. The first solution consists in

adopting non-centralised odourisation practices. It is currently being assessed tech-

nically and economically on two small scale units. An alternative solution is also

being considered, with a de-odourisation plant, more suitable for intermittents flows.

The results from these two feasibility studies are expected in 2017.

\\

The creation of a reverse flow from Switzerland to France at Oltingue

(TRA-F-045)

The Open Season conducted jointly by GRTgaz and FluxSwiss in 2012 to create a

new entry point from Switzerland to France by 2016–2018 could not lead to invest-

ments although stakeholders confirmed their interest. GRTgaz proposed in 2014 a

new product associated with less investments. Due to the reduced cost, CRE then

decided to validate this new product without going through the process of Open

Season. GRTgaz took a FID in 2015. The corresponding infrastructure will be com-

missioned in 2018, enabling a reverse flow at Oltingue from Switzerland up to

200GWh/d, 100GWh/d being interruptible. This new entry point will give access to

new supply sources from Italy and will enable further arbitrage for shippers between

hubs.

INTERCONNECTION CAPACITIES OF THE SOUTH REGION WITH OTHER EU COUNTRIES

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Alveringem

FR >

Beh

270 270 270 270 270 270 270 270 270 270 270 270

Blaregnies (BE)/

Taisnières (H)

(FR) (Segeo/Troll)

BEh >

FR

640 640 640 640 640 640 640 640 640 640 640 640

Blaregnies L

(BE)/Taisnières B

(FR)

BEb >

FR

230 230 230 230 230 230 230 230 230 230 230 230

Oltingue (FR)/

Rodesdorf (CH)

223 223 223 223 223 223 223 223 223 223 223 223

Obergailbach

(FR)/ Medelsheim

(DE)

DE >

FR

620 620 620 620 620 620 620 620 620 620 620 620

FR >

DE

0

0

0

0

0

0

0

100 100 100 100 100

Less advanced non-FID

Table 6.10:

Interconnection capacities of the South Region with other EU countries (Source: TYNDP 2017)