Gas Regional Investment Plan of the South Region 2017 |

91

7.1.4.2 Definition of scenarios

From the Portuguese and Spanish side, demand scenarios were stablished as

following:

In this joint study, each TSO determined the potential capacity in the 3

rd

IP PT-ES

for all the scenarios and considered the values of highest probability of occurrence,

obtaining the common capacities (lesser rule) shown in the following table:

The total cost of the considered infrastructures is approximately M€ 771.

The cost of the considered infrastructures for the 1

st

Stage of the project is approx-

imately M€ 189 and for the 2

nd

Stage of the project is approximately M€ 582, with

a total of M€ 771

 7)

.

The outputs of both technical studies (capacities and related infrastructures) have

been considered in ENTSOG TYNDP 2017 

 8)

and have also been included in the

infrastructure chapter of this GRIP South.

 7) 3

rd

Interconnection point between Spain and Portugal, technical study between Enagás and REN

 8)

http://www.entsog.eu/publications/tyndp#ENTSOG-

TEN-YEAR-NETWORK-DEVELOPMENT-PLAN-2017

3

RD

IP CAPACITY

2020

2025

2030

PT

ES

Final Value (GWh/day)

Spain

to Portugal

1

st

Step 1

st

Step

70

2

nd

Step

2

nd

Step

107

3

rd

Step

139

Portugal

to Spain

1

st

Step 1

st

Step

70

2

nd

Step

2

nd

Step

97

3

rd

Step

126

Table 7.2:

Final 3

rd

IP capacity for both directions (Source: TSO own elaboration)

DEMAND SCENARIO

DESCRIPTION

Portugal

Base scenario

Final Demand

Moderate economic growth, scenarios were built from the

forecasted values for summer, winter and peak demand for

2020, 2025 and 2030

Power Sector

Moderate economic growth and existing coal fired power plants

of Sines and Pego are not decommissioned until 2025

SoS scenario

Final Demand

High economic growth, scenarios were built from the

forecasted values for summer, winter and peak demand for

2020, 2025 and 2030

Power Sector

High economic growth and existing coal fired power plants of

Sines and Pego are decommissioned before 2025

Spain

Final demand & Power sector

Enagás stablished three scenarios in 2020, 2025 and 2030,

average winter, average summer and peak winter day

Table 7.1:

Description of demand scenarios in Portugal and Spain of 3

rd

Interconnection Point between Portugal and

Spain technical studies (Source: TSO own elaboration)