Previous Page  23 / 56 Next Page
Information
Show Menu
Previous Page 23 / 56 Next Page
Page Background

GOLD

March 2017

MODERN MINING

21

Above:

View of CIL tank

construction from the top of

the tower crane.

Above left:

A recent view

of the Yanfolila site with the

tower crane in place at the

processing plant site.

Left:

Location of Humming-

bird’s two gold projects in

West Africa.

of producers. Moreover, a rapid payback on

the capital invested is anticipated with over

US$70 million expected to be generated in the

first full year of production.

The average annual gold production over a

Life of Mine (LOM) of eight years is estimated

at 107 000 ounces although the first full year of

operation will see 132 000 ounces being pro-

duced. In all, some 8,7 Mt of ore (at an average

grade of 2,95 g/t and a LOM strip ratio of 11,9

to 1) will be mined over the LOM to produce a

total of 770 000 ounces.

Comments Monro: “The impressive