Southern Corridor GRIP 2014–2023 |
59
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
800
400
200
600
1,400
1,200
1,000
GWh/d
IP Lanžhot (SK > CZ)
Figure 4.7.1:
Lanžhot: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
800
400
200
600
1,400
1,200
1,000
GWh/d
IP Lanžhot (SK > CZ)
Figure 4.7.2:
Lanžhot: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
800
400
200
600
1,800
1,600
1,400
1,200
1,000
GWh/d
IP Baumgarten (SK > AT)
Figure 4.8.1:
Baumgarten: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
800
400
200
600
1,800
1,600
1,400
1,200
1,000
GWh/d
IP Baumgarten (SK > AT)
Figure 4.8.2:
Baumgarten: Flows and booked capacity
vs. technical capacity (daily)
Lanžhot (eustream > NET4GAS)
Bidirectional
The important reduction of the technical capacity was the consequence of a similar reduction made in the
Import Point of Velké Kapušany (see below).
Baumgarten (eustream > BOG, Gas Connect Austria and TAG)
Bidirectional