ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report - page 64

64 |
Southern Corridor GRIP 2014–2023
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
3,500
2,500
3,000
2,000
1,500
1,000
500
GWh/d
IP Ve
ľ
ké Kapušany (UA > SK)
Figure 4.17.1:
Uzhgorod / Velké Kapušany: Flows versus technical
capacity (physical congestion considerations)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
3,500
2,500
3,000
2,000
1,500
1,000
500
GWh/d
IP Ve
ľ
ké Kapušany (UA > SK)
Figure 4.17.2:
Uzhgorod / Velké Kapušany: Flows and booked
capacity vs. technical capacity (daily)
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
700
500
600
400
300
200
100
GWh/d
IP Beregdaróc (UA > HU)
Figure 4.18.1:
Beregdaróc: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
700
500
600
400
300
200
100
GWh/d
IP Beregdaróc (UA > HU)
Figure 4.18.2:
Beregdaróc: Flows and booked capacity
vs. technical capacity (daily)
Uzhgorod / Velké Kapušany (Ukrtransgaz > eustream)
The important reduction of the technical capacity was made in order to allow for a
more efficient operation of the compressor station, given the reduced use of the IP
by shippers.
Beregdaróc (Ukrtransgaz > FGSZ)
1...,54,55,56,57,58,59,60,61,62,63 65,66,67,68,69,70,71,72,73,74,...106