Southern Corridor GRIP 2014–2023
Average daily
Technical Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
350
300
250
200
150
100
50
GWh/d
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
Figure 4.27.1:
Cavarzere: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
350
300
250
200
150
100
50
GWh/d
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
Figure 4.27.2:
Cavarzere: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
160
120
140
100
80
60
40
20
GWh/d
IP Revythoussa (LNG > GR)
Figure 4.28.1:
Revythoussa: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
160
120
140
100
80
60
40
20
GWh/d
IP Revythoussa (LNG > GR)
Figure 4.28.2:
Revythoussa: Flows and booked capacity
vs. technical capacity (daily)
Cavarzere (Terminale GNL Adriatico >
Snam Rete Gas and Infrastrutture Trasporto Gas)
\\
Booked capacity is not, in this case, a useful indicator for the capacity
adequacy analysis, as in Italy the terminal operators reserve capacity in the
transmission system on behalf of their users.
\\
The Offshore LNG Toscana (OLT) terminal was commissioned in the last
quarter of 2013 therefore no historical data are available for the time
window examined.
Revythoussa (DESFA > DESFA)