ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report - page 68

68 |
Southern Corridor GRIP 2014–2023
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
40
30
35
25
20
15
10
5
GWh/d
Jidilovo (BG > MK)
Figure 4.24.1:
Jidilovo: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
40
30
35
25
20
15
10
5
GWh/d
Jidilovo (BG > MK)
Figure 4.24.2:
Jidilovo: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
160
120
140
100
80
60
40
20
GWh/d
IP Beregdaróc (HU > UA)
Figure 4.25.1:
Beregdaróc: Flows and booked capacity
vs. technical capacity (monthly)
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
160
120
140
100
80
60
40
20
GWh/d
IP Beregdaróc (HU > UA)
Figure 4.25.2:
Beregdaróc: Flows and booked capacity
vs. technical capacity (daily)
Jidilovo (Bulgartransgaz > GA-MA)
Unidirectional
Beregdaróc (FGSZ > Ukrtransgaz
1)
)
Bidirectional
1) Only interruptible capacity is offered at the Beregdaróc IP in the direction from Hungary to Ukraine.
1...,58,59,60,61,62,63,64,65,66,67 69,70,71,72,73,74,75,76,77,78,...106
Powered by FlippingBook