Southern Corridor GRIP 2014–2023 |
61
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
250
200
150
100
50
GWh/d
IP Negru Voda 1 (RO > BG)
Figure 4.11.1:
Negru Voda 1: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
250
200
150
100
50
GWh/d
IP Negru Voda 1 (RO > BG)
Figure 4.11.2:
Negru Voda 1: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Booked non interruptible + interruptible Capacity
Flow Range
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
700
600
500
400
300
200
100
GWh/d
IP Negru Voda 2+3 (RO > BG)
Figure 4.12.1:
Negru Voda 2 & 3: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
Oct
2011
Dec
2011
Feb
2012
Apr
2012
Jun
2012
Aug
2012
Oct
2012
Dec
2012
Feb
2013
Apr
2013
Jun
2013
Aug
2013
0
700
600
500
400
300
200
100
GWh/d
IP Negru Voda 2+3 (RO > BG)
Figure 4.12.2:
Negru Voda 2 & 3: Flows and booked capacity
vs. technical capacity (daily)
Negru Voda 1 (Transgaz > Bulgartransgaz)
Bidirectional
Negru Voda 2 & 3 (Transgaz > Bulgartransgaz)
Unidirectional