A new outlet facility was added to a site to transfer fluids
to another location.
∗
Brownfield installation used dual trip circuits that each
used an energized to trip.
∗
New facilities were installed as per the design, had quality
control and checks at various stages, including FAT, and
commissioning before handing over to site for operations.
∗
What could go wrong ??
Project 1: Greenfield added to Brownfield