A new outlet facility was added to a site to transfer fluids

to another location.

Brownfield installation used dual trip circuits that each

used an energized to trip.

New facilities were installed as per the design, had quality

control and checks at various stages, including FAT, and

commissioning before handing over to site for operations.

What could go wrong ??

Project 1: Greenfield added to Brownfield