Small site with no Instrument Engineer.

Change being implemented on part of their shutdown system.

The design by a large engineering procurement contractor

(EPC).

EPC supplied installation, commissioning and site acceptance

testing (SAT) documentation.

Installation and implementation through a local based company.

Local based company had very experienced supervisor, who

overseen the installation and commissioning.

What could go wrong?

Project outline