7-7

City of Morgan Hill

Sewer System Master Plan

7.3.1

Butterfield Trunk

This section documents pipeline improvements within the Butterfield Trunk sewer service area.

x

BT-P1

: Construct a new 8-inch gravity sewer in Peet Road from 3,000 feet east of

Cochrane Road to Cochrane Road.

x

BT-P2:

Replace the existing 10-inch gravity sewer along North-Bound US 101 from 900

feet north of Cochrane Road to intersection of Cochrane Road and North-Bound US 101.

7.3.2

Hale-Llagas Trunk

This section documents pipeline improvements within the Hale-Llagas Trunk sewer service area.

x

HL-P1

: Replace the existing 8-inch gravity sewer along Llagas Creek Drive from Eagle

Springs Court to Hale Avenue. It should be noted that the condition assessment report

included in Appendix C of this 2017 Master Plan also recommends replacement of this 8-

inch trunk due to its adverse conditions.

7.3.3

East Dunne Trunk

This section documents pipeline improvements within the Hale-Llagas Trunk sewer service area.

x

ED-P1

: Construct a new 8-inch gravity sewer in Diana Avenue from Murphy Avenue to

Condit Road.

x

ED-P2

: Replace the existing 8-inch gravity sewer along Dunne Avenue from 230 feet east

of Murphy Avenue to Condit Road.

x

ED-P3

: Replace the existing 8-inch and 10-inch gravity sewer along Dunne Avenue from

Condit Road to 530 feet east of Walnut Grove Drive.

7.3.4

Hale-Monterey Trunk

This section documents pipeline improvements within the Hale-Monterey Trunk sewer service

area.

x

HM-P1

: Construct a new 12-inch gravity sewer along Dunne Avenue from Monterey Road

to Railroad Avenue.

7.3.5

Railroad-Monterey Trunk

This section documents pipeline improvements within the Railroad-Monterey Trunk sewer service

area.

x

RM-P1

: Replace the existing 10-inch gravity sewer along San Pedro Avenue from

Butterfield Boulevard to Railroad Avenue.