City of Morgan Hill

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

12-0248 AEG CofMorganHill FM Rpt.docx

Page 1 of 46

EXECUTIVE SUMMARY

Scope and Purpose

V&A was retained by Akel Engineering Group to perform sanitary sewer flow monitoring and inflow and

infiltration (I/I) analysis within the City of Morgan Hill, California (City). Flow monitoring was performed

over a 20-day period at ten open-channel flow monitoring sites within the City. The flow monitoring

period began on February 25, 2014, and ended on March 17, 2014. The purpose of this study was to

measure sanitary sewer flows at the flow monitoring sites and estimate available sewer capacity and

infiltration and inflow (I/I) occurring in the basins upstream from the flow monitoring sites.

V&A had access to flow monitoring data from the Harding Avenue Flow Meter. This meter measures

the total flow from the City of Morgan Hill through a single 21-inch transmission sewer line sewer prior

to entering into the City of Gilroy collection system. Flows from this meter during the flow monitoring

period are also presented in this report and used to establish system totals.

Site Flow Monitoring and Capacity Results

Peak measured flows and the corresponding flow levels (depths) are important to understand the

capacity limitations of a collection system.

Table 1

summarizes the peak recorded flows, levels,

d

/

D

ratios, and peaking factors per site during the flow monitoring period. Capacity analysis data is

presented on a site-by-site basis and represents the hydraulic conditions only at the site locations;

hydraulic conditions in other areas of the collection system will differ.

Table 1. Capacity Analysis Summary

Metering

Site

ADWF

(mgd)

Peak

Measured

Flow

(mgd)

Peaking

Factor

Diameter

(in)

Peak

Level

(in)

Peak

d

/

D

Ratio

Level

Surcharged

above

Crown (ft)

Site 1

0.19

0.56

2.93

18

3.73

0.21

-

Site 2

0.36

0.88

2.45

19.75

7.94

0.40

-

Site 3

0.32

0.93

2.95

15

13.13

0.88

-

Site 4

0.21

0.53

2.49

12

6.04

0.50

-

Site 5

1.15

2.29

1.98

24

15.95

0.66

-

Site 6

0.35

0.91

2.60

17.75

12.52

0.71

-

Site 7

0.24

0.77

3.17

21

6.82

0.32

-

Site 8

0.16

0.43

2.73

17.5

6.76

0.39

-

Site 9

0.13

0.41

3.03

15

6.36

0.42

-

Site 10

0.12

0.31

2.45

11.75

4.57

0.39

-