City of Morgan Hill

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

12-0248 AEG CofMorganHill FM Rpt.docx

Page 2 of 46

The following capacity analysis results are noted:

Peaking Factor:

Sites 7 and 9 had peaking factors that exceeded typical design threshold

limits for the ratio of peak flow to average dry weather flow.

d

/

D

Ratio:

Only Site 3 had a

d

/

D

ratio that exceeded the common design threshold for

d

/

D

ratio. None of the flow monitoring sites reached surcharge conditions.

Figure 1 s

hows bar graphs of the capacity results.

Figure 2 s

hows a schematic diagram of the peak

measured flows with peak flow levels.

Figure 1. Capacity Summary Bar Graphs: Peaking Factors and Peak

d

/

D

Ratios

2.93

2.45

2.95

2.49

1.98

2.60

3.17

2.73

3.03

2.45

1.92

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Site 1

Site 2

Site 3

Site 4

Site 5

Site 6

Site 7

Site 8

Site 9

Site 10

Harding

Peaking Factor

0.21

0.40

0.88

0.50

0.66

0.71

0.32

0.39

0.42

0.39

0.62

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Site 1

Site 2

Site 3

Site 4

Site 5

Site 6

Site 7

Site 8

Site 9

Site 10

Harding

d/D Ratio

Surcharge

Threshold

Typ. Design

Threshold

Typical

Design

Threshold