Previous Page  390-391 / 431 Next Page
Information
Show Menu
Previous Page 390-391 / 431 Next Page
Page Background

HARDING

Site Capacity and Surcharge Summary

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

Peak Measured Level:

13

Peak d/D Ratio:

0.62

Pipe Diameter:

21

inches

inches

Realtime Flow Levels with Rainfall Data over Monitoring Period

Diameter

0

5

10

15

20

25

02/25

02/26

02/27

02/28

03/01

03/02

03/03

03/04

03/05

03/06

03/07

03/08

03/09

03/10

03/11

03/12

03/13

03/14

03/15

03/16

Level (in)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Rain (in)

Page Harding - 6

12-0248 AEG Morgan Hill FM and II Rpt.doc