Previous Page  393 / 431 Next Page
Information
Show Menu
Previous Page 393 / 431 Next Page
Page Background

HARDING

Weekly Level, Velocity and Flow Hydrographs

2/24/2014 to 3/3/2014

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

0

2

4

6

8

10

12

14

16

18

20

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Level (in)

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

Velocity (fps)

Vel

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

2/24

2/25

2/26

2/27

2/28

3/1

3/2

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rain

Flow

BLFlow

Total Weekly Rainfall: 3.19 inches

Avg Level: 9.82 in. Peak Level: 12.99 in. Min Level: 5.69 in.

Avg Velocity: 3.86 fps Peak Velocity: 5.10 fps Min Velocity: 2.50 fps

Avg Flow: 2.846 mgd Peak Flow: 5.093 mgd Min Flow: 0.871 mgd

Page Harding - 8

12-0248 AEG Morgan Hill FM and II Rpt.doc