Previous Page  394 / 431 Next Page
Information
Show Menu
Previous Page 394 / 431 Next Page
Page Background

HARDING

Weekly Level, Velocity and Flow Hydrographs

3/3/2014 to 3/10/2014

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

0

2

4

6

8

10

12

14

16

18

20

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Level (in)

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

Velocity (fps)

Vel

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

3/3

3/4

3/5

3/6

3/7

3/8

3/9

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rain

Flow

BLFlow

Total Weekly Rainfall: 0.17 inches

Avg Level: 9.49 in. Peak Level: 12.65 in. Min Level: 5.65 in.

Avg Velocity: 3.77 fps Peak Velocity: 4.76 fps Min Velocity: 2.51 fps

Avg Flow: 2.667 mgd Peak Flow: 4.627 mgd Min Flow: 0.896 mgd

Page Harding - 9

12-0248 AEG Morgan Hill FM and II Rpt.doc