Previous Page  392 / 431 Next Page
Information
Show Menu
Previous Page 392 / 431 Next Page
Page Background

HARDING

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

I/I Summary: Event 1

Baseline and Realtime Flows with Rainfall Data over Monitoring Period

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

02/25

02/26

02/27

02/28

03/01

03/02

03/03

03/04

03/05

03/06

03/07

03/08

03/09

03/10

03/11

03/12

03/13

03/14

03/15

03/16

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rainfall: 1.95 inches

Event 1

0.00

1.00

2.00

3.00

4.00

5.00

6.00

02/28

03/01

03/02

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Event 1 Detail Graph

Storm Event I/I Analysis (Rain = 1.95 inches)

5.09

Peak Flow:

PF:

mgd

1.92

Capacity

2.97

Peak I/I Rate:

mgd

Inflow / Infiltration

Total I/I:

gallons

1,135,000

12-0248 AEG Morgan Hill FM and II Rpt.doc

Page Harding - 7