Cover
Main shaft headgear at Wesizwe’s
Bakubung platinum mine. Worley
Parsons is the EPCM contractor
on the project. See page 18 for an
article on Advisian, the new advi
sory and consulting services arm of
WorleyParsons.
Editor
Arthur Tassell
Advertising Manager
Bennie Venter
e-mail:
benniev@crown.co.zaDesign & Layout
Darryl James
Circulation
Karen Pearson
Publisher
Karen Grant
Printed by:
Shumani Mills Communications
The views expressed in this publication
are not necessarily those of the editor or
the publisher.
Published monthly by:
Crown Publications cc
P O Box 140,
Bedfordview, 2008
Tel: (011) 622-4770
Fax: (011) 615-6108
e-mail:
mining@crown.co.za www.modernminingmagazine.co.zaAverage circulation
(April–June 2015)
4 370
MODERN
M I N I N G
CONTENTS
NOVEMBER 2015
12
18
22
ARTICLES
REGULARS
28
36
MINING NEWS
4
Platinummine to deliver first concentrate in January 2016
5
Weatherly to investigate increasing Tschudi’s capacity
6
Masimong Group to acquire majority stake in Liviero
7
New Liberty back on track after crusher outage
8
Pilot plant for rare earth project operational
10
True Gold on track for gold production at Karma
11
Potential for diamond-bearing alluvial deposits at Lerala
12
Mustang reports“robust”diamond recoveries at Save River
13
‘Preferred Contractors’appointed for Ethiopian
gold project
14
Kumba’s production increases quarter on quarter
15
Black Rock Mining acquires Bagamoyo graphite project
16
Tongon gold mine passes major milestone
PRODUCT NEWS
52
Latest generation Cat backhoe loader released
53
Osborn secures order to supply Kibali gold mine
54
SEW-EURODRIVE enhances its service offering
55
Joest Kwatani expands to Botswana
56
Lock-out systems minimise risk
57
Komatsu and RentWorks launch KomRent
58
Aury Africa introduces mini vibrating screens
59
Machine launches feature at Powerscreen open day
60
Faster, safer tyre change-outs with Cat wheel rims
COVER 18 Advisian – redefining the advisory and consulting services industry COAL 22 Keaton Energy’s flagship mine“running like a dream” GOLD 28 Record-breaking quarterly performance by Randgold Resources PLATINUM 35 Design of high-tonnage headframe completed FEATURE – CONSULTANTS/PROJECT HOUSES 36 Bara Consulting thrives despite the mining downturn 42 Broad range of specialised skills give VBKom the edge 47 SRK turns EIA challenge into an opportunity 48 Fluor puts down roots in Botswana 50 BBE celebrates 25 years in businessNovember 2015
MODERN MINING
1




