HSE Inspection

§

Scheduled HSE C& I Inspection

§

Normal inspector ill, so Specialist Inspector of Health and

Safety EC&I deputised

§

Reviewed Functional Safety documents

§

A number of actions were raised

§

Requested more information on the SIL 2 overfill SIF

justification

§

Documents sent by terminal operator included SIL

Certificate and supporting Failure Mode Effects and

Diagnostic Analysis (FMEDA) and Proven-in Use report

©ABBGroup

October23,2016|Slide9

HSE Specialist Inspector’s Response

§

After examining the documents the inspector

stated: -

§

The information would not form the basis of

a suitable demonstration that Relevant Good

Practice has been met

§

The company were advised to consider

alternate measures

§

In effect the HSE Specialist Inspector has said

‘No’ to the SIL 2 Certificate

§

The Design Contractor and Terminal Owner

thought they had bought a ‘SIL 2’ solution –

what went wrong?

§

Terminal owner gave me a call