Table of Contents Table of Contents
Previous Page  69 / 601 Next Page
Information
Show Menu
Previous Page 69 / 601 Next Page
Page Background

Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.6. Subdivision Approvals

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 2-43

(2)

Certification and Recordation of Approved Final Plat

(A)

If the Final Plat is approved, the applicant shall revise the Final Plat as necessary

to incorporate any conditions of approval and any required certification forms and

signatures, and submit the revised plat to the Planning Director for review.

(B)

On determining that the plat has been properly revised and that all prerequisites

to recordation of the plat have been met, the Planning Director shall certify the

Town’s approval on the plat.

(C)

The applicant shall then record the Final Plat with the Register of Deeds for the

county in which the development site is located and return a copy of the recorded

Final Plat to the Planning Director.

(3)

Effect of Approval

Recordation of a certified Final Plat authorizes the applicant to convey the platted lots

by reference to the recorded plat. It also authorizes the owners of recorded lots to submit

applications for a Building Permit or other development permit or approval required to

development the lot, provided all dedications and public infrastructure and private utility

improvements required to serve the lot have been completed and accepted by the

appropriate agency.

(4)

Expiration of Approval

If the applicant fails to record the Final Plat within 30 days after the date of its approval,

the Final Plat Approval shall become invalid. A recorded Final Plat shall not expire.

Final Plat Approval Review Standards

An application for Final Plat Approval shall be approved only if the Planning Director determines

that the Final Plat:

a.

Substantially conforms to an unexpired and valid Type 1 Subdivision Preliminary Plat Approval

or Type 2 Subdivision Preliminary Plat Approval for the subdivision;

b.

Identifies tree protection areas as required in Section

5.4.5, Tree Protection Plan and Tree Protection Areas;

c.

Complies with applicable standards in

Article 5: Development Standards, Article 6: Riparian Buffers, Article 7: Stormwater Management,

and

Article 8: Performance and Maintenance;

d.

Complies with all other applicable standards in this Ordinance;

e.

Complies with all other applicable Town ordinances and state and federal laws; and

f.

Includes all required certifications.

(Ord. No. 2016-001, 05/10/2016)

D.

Determination of Subdivision Exclusion

Determination of Subdivision Exclusion Procedure

Figur

e 2.5.6.D.1

and the following subsections identify those steps in the standard review procedure

(see

Section 2.4)

applicable to the review of a Determination of Subdivision Exclusion application

and note any specific variations of, or additions to, those review steps.

a.

Application Submittal and Acceptance

The application shall be submitted and accepted, and may be withdrawn, in accordance with

Section

2.4.3,

except that this application is not eligible for a 50 percent refund.