Table of Contents Table of Contents
Previous Page  66 / 150 Next Page
Information
Show Menu
Previous Page 66 / 150 Next Page
Page Background

60

Sag =

To fall below the horizontal line.

.

Sailor =

Brick laid on end with the large or bed side

facing outward.

Salmon brick =

A poor quality brick that lacks weather

resistance; so named because of its pink color;

commonly used to fill spaces.

Saturation coefficient - C/B ratio =

The amount of cold water absorbed by a brick to

the amount of boiling water absorbed. Indicator

of how a brick will react to freezing and thawing

cycle.

Saturation line =

A line indicating the ground water level.

Scratch coat =

First or base coat of a two-coat plastering or

parging. Coat is scratched to form a good

bonding surface for the finish coat.

Serpentine =

W

all that curves

back and forth.

Set - setting - setting up =

Hardening of mortar; in initial set, mortar

reaches a partial strength; in final set, the full

specified hardness is attained.

2.

Laying

masonry units in place.

3.

Hardening of mortar.